"loutent" wrote in message
Anyhow, some of the lower cabinets, I can clmp the FF to, but the uppers
over the FP are already lagged into the brick and have the backs on.
Also, the outside of the carcass of those cabinets is not accessible.
This is why I was thinking of using pocket screws - at least in that
area. Also, since I just got this new Kreg jig, I was toying with using
the PS all over and avoid the clamps altogether.
I use a blind nailer for attaching my face frames.
http://www.leevalley.com/wood/page.a...83&cat=1,41182