View Single Post
  #7   Report Post  
Posted to rec.woodworking
Juergen Hannappel
 
Posts: n/a
Default Metal Building vs. Framed Workshop

"James \"Cubby\" Culbertson" writes:

"James "Cubby" Culbertson" wrote in message
...
Hiya folks,
Getting the gears going regarding building a shop next year. I'm looking
at something in the 900 to 1000 SF range. Aside from the cost of


[...]

metal roofing capturing heat/cold. I live in NM and it get's pretty darned
warm in the summer so maybe I should just stick with conventional building.


Maybe build a green roof, with plants on it?

I do plan to do this over a slab but am planning on pouring the slab such


Whan kind of ground do you have to build on? Not all places need a
poured slab, if the ground is stable enough by itself you can get away
without concrete slabs.

DC piping. Obviously I'd have to find a way to mount the floor with easy
access to the area below it.


One way of easy acces: Build/Buy floor boards of reasonable size, like
0.5 x 1m, and put them on special levelable posts at their corners,
AKA industrial false floor.

--
Dr. Juergen Hannappel http://lisa2.physik.uni-bonn.de/~hannappe
Phone: +49 228 73 2447 FAX ... 7869
Physikalisches Institut der Uni Bonn Nussallee 12, D-53115 Bonn, Germany
CERN: Phone: +412276 76461 Fax: ..77930 Bat. 892-R-A13 CH-1211 Geneve 23